Sail Cannes

the logbook

Mast -reborn

The rig was taken out during the 3 week yard period. It was stripped of old varnish and inspected thoroughly. A small area of rot

Read More »

Haul out

ALGUE spent 3 weeks out of the water. During this time the rig was removed and the interior from the mast back to the engine

Read More »

Deck re-caulking

The traditional teak deck was laid in 2001 and the teak was in good condition, however the caulking had completely failed. The seams were reamed

Read More »

what our Guests say

Rated 5 stars on TripAdvisor, AirBnB and Viator

5/5

Leave a Review

Have you sailed with us?
We’re always looking to improve our offering, and we’d love to hear your thoughts!